The GST Credit Bridge for New Plant (2026)
🏭 Manufacturing •
GST timing •
progress payments •
facility choice •
2026 •
Business Owners Finance Hub
This isn’t a “quarterly survival” BAS post. It’s the specific cash squeeze that happens when you pay plant milestones now, but the GST credit lands later — while you’re still waiting on install, commissioning, and the first production run.
If you want the readiness baseline first, use: 11 Signs Your Business Is Ready for Asset Finance in 2025. For the core asset lane entry point, start here: Low Doc Asset Finance.
1) The only timeline that matters: milestones vs BAS
Progress payments are real cash out the door. A GST credit is real — but it’s not cash you can spend until the BAS is lodged and processed. The bridge is simply the gap between those two clocks.
| Timeline step | What happens | What breaks (if you don’t bridge) | What to document |
|---|---|---|---|
| Quote → deposit | Supplier wants a deposit to lock build / slot. | Cash buffer drops before any output improves. | Milestone schedule + supplier invoice. |
| Build / shipping | Second payment triggers production / dispatch. | Wages + suppliers still run, but cash is tied up. | Progress claim + delivery window. |
| Install / commissioning | Final payment on sign-off / install completion. | Downtime overlaps with the last big payment. | Install plan + “back to production” date. |
| BAS lodged → refund lands | GST credit is claimed and paid back. | If you’re tight, you’re forced to “rob Peter to pay Paul”. | BAS rhythm + last cycle timing proof. |
2) LOC vs Working Capital Loan (which bridge fits this gap?)
This is where people pick the wrong tool. You’re not funding the machine (that’s the asset facility). You’re funding the timing gap — so the bridge needs to flex with milestone dates, not force a rigid drawdown you don’t need.
| Option | When it fits best | Common mistake | How to keep it clean |
|---|---|---|---|
| LOC-style bridge (revolving flexibility) |
Milestones are uneven and dates can shift (supplier delays, install changes). | Using it with no plan to pay it down once the refund lands. | Write the “refund paydown plan” in one paragraph and stick to it. |
| Working capital loan (defined amount, defined window) |
The gap is clear and time-boxed (e.g., deposit + final payment window). | Borrowing too much “just in case” and creating servicing pressure. | Cap the buffer to milestones only and show the exit trigger. |
Quick definitions (so you don’t mix lanes): a Business Line of Credit is about flexible access, while Working Capital is about funding a defined timing gap.
3) The “bridge pack” that prevents follow-ups
The fastest approvals happen when you show the assessor you’re not using “GST” as a vague excuse — you’re matching specific milestone dates to a defined gap. Keep it tight and boring.
If you want a clean submission workflow for manufacturing deals, use: Factory Plant Finance “Day 0” Submission Bundle (2026). If you’re deciding product structure (lease vs buy) before you lock milestones, read: Lease vs Buy Equipment.
The GST credit bridge is a timing play: progress payments go out on milestones, while the GST credit only helps once the BAS is lodged and processed. Match the facility to the gap (flex vs fixed), cap it to milestones, and write the paydown trigger clearly.
If you’re funding plant this year, start with the main asset lane: Low Doc Asset Finance. For the fastest submission workflow, use the manufacturing Day 0 pack: Day 0 Submission Bundle.
FAQ
Just the timing gap. The machine is funded under the asset facility; the bridge is for the milestone-to-refund window so cashflow stays stable.
This is tied to progress payments and commissioning timing on a specific plant purchase — not a general end-of-quarter cash survival plan.
No milestone schedule. If the bridge amount and window aren’t tied to specific supplier payments, it reads as a vague cash request.
Write the paydown trigger upfront (e.g., “GST refund lands → pay down X”, “first production run completes → reduce buffer”) and stick to it.
Usually yes. The cleanest approvals happen when the pack is built around the milestone schedule before the first payment hits.