Commercial Renovation Loans: Funding a Refurbishment of Your Building

Commercial Renovation Loans: Funding a Refurbishment of Your Building

How owners fund a commercial building refurbishment: top-ups, equity release, staged draws, as if complete valuations and tenants leaving mid-works.

Commercial Renovation Loans | Switchboard Finance
Switchboard Finance Business Owners Hub

Commercial Renovation Loan · As If Complete · Staged Draws

Commercial Renovation Loans: Funding a Refurbishment of Your Building

A 1980s office building, two tenants leaving at lease end, a roof and lifts that are due, and an owner who wants to re-lease at a better rent. Here is how that refurbishment gets funded, valued and drawn, and where the loan can stall along the way.

Published 17 November 2026 / Reviewed 17 November 2026 / Nick Lim, FBAA Accredited Finance Broker / General information only

Quick Answer

An owner usually funds a commercial refurbishment by increasing the existing loan, releasing equity, drawing a construction-style facility in stages, or bridging with private money, and the lender sizes it on the building's value before and after the works. Which route fits depends on how much of the building stays leased while the builder is on site, and on whether the commercial property loan can carry the cost until new leases are signed. For an owner with equity elsewhere, equity release is often the cleanest start.

Also called: commercial refurbishment loan, commercial property renovation finance, capex loan. Capex loan is the accounting term for the same spend: money put into the building itself rather than into running the business.

What is a commercial renovation loan?

A commercial renovation loan is finance an owner uses to pay for capital works on a building they own or are buying, such as a new roof, lift replacement, upgraded services, a facade refresh or new common areas, secured against that same building. It is not a separate product so much as a way of structuring a commercial property loan so the money arrives when the works need it and the debt matches what the building will be worth once they are done.

The spend is capex: it goes into the asset, not into stock, wages or the day-to-day running of a business. That matters because the lender is lending against an improvement that does not exist yet, and the security is partly a promise until the builder finishes.

Is it the same as a fit-out loan?

A commercial renovation loan is not the same as a fit-out loan, because a fit-out is usually the tenant's spend inside their own space while a renovation is the owner's spend on the building. Tenant fit-out finance has its own rules and is covered in our post on commercial lease fit-out finance. Three related jobs also sit elsewhere: refurbishing a cafe property you trade from is in refinancing your cafe property for refurbishment, converting offices to homes is in office to residential conversion finance, and energy rating upgrades are in NABERS ratings and commercial property loans. Buying a house to renovate and sell is a separate loan, covered in fix and flip finance.

Take the owner of a tired 1980s office building. Two tenants are leaving at lease end, the roof is near the end of its life and the lifts are due. The plan is to do the works while the floors are empty and re-lease at a better rent. Every question in this post is a question that owner faces, in roughly the order they face it.

Which loans can fund a refurbishment of a building you own?

Most owners fund a refurbishment in one of five ways: increase the existing loan, release equity from this or another property, take a facility that pays out in stages as the works progress, bridge the works with private money, or pay cash and stage the works over time. Which one fits depends on the size of the job, how much equity the building already carries and whether rent keeps coming in while the builder is on site.

Which way of funding a commercial refurbishment suits you, and what does the lender test? (November 2026)
Option Usually suits What the lender tests Watch for
Increase the existing loan Smaller jobs where the building stays mostly leased Current value, current rent and the owner's other income The full amount is drawn and charged interest from day one
Equity release Owners with equity in this or another property Value of every security, servicing across all debts A refinance can reset the term and bring new fees, varies by lender
Progress-draw facility Larger works with a builder's contract and a schedule Fixed price contract, quantity surveyor report, as if complete value Draws only release once each stage is inspected
Private or bridging loan Tight timing, or a building that fails bank policy mid-works The security and the exit more than the borrower's income Higher cost and a short term, so the way out must be planned first
Cash and staged works Owners with strong cash flow and a flexible timeline Nothing until the refinance, then the improved building Slower works and a longer period of reduced rent

In practice, the choice is rarely one option alone. A common shape is a modest top-up for the early stages, a progress-draw limit for the major works, and a refinance once the building is re-leased.

How do lenders value the building before and after the works?

Lenders usually ask the valuer for two figures: the building's value as it stands today, and its value as if the works are complete and the space is leased at market rent. The working rule is as is today, as if complete tomorrow: the as is figure caps what the lender will advance before works start, and the as if complete figure sets how far the facility can stretch once they are done. Our guide to what lenders test in a commercial valuation covers the method in full.

Between those two figures sits the cost to complete. On anything beyond a small job, the lender will want a quantity surveyor to review the builder's contract, confirm the budget is realistic and inspect each stage. Draws follow the quantity surveyor, not the builder's invoice: if the surveyor says a stage is not finished, the money waits, whatever the builder has billed.

Before, during, after

  • Before: as is value and the rent already in place
  • During: cost to complete, checked by the quantity surveyor
  • During: rent from the tenants who stay
  • After: as if complete value on new leases

Where the numbers slip

  • Builder's price runs past the surveyor's budget
  • Tenants leave earlier than planned
  • A permit adds works nobody costed
  • Re-leasing takes longer than the valuer assumed

The gap between the two valuations is not free equity. Lenders typically lend a lower share of the as if complete value than they would on a finished, leased building, because some of that value depends on leases that are not signed yet. How much lower varies by lender and by how speculative the re-leasing looks.

What happens to the loan if tenants leave during the works?

If tenants leave during the works, the lender assesses the loan on the reduced rent that actually comes in, plus the owner's other income, so the building has to stay serviceable when it is part empty while the works run. That is the moment most refurbishment files are won or lost, because a building that looked comfortable on full rent can look thin on half.

Serviceability on a refurbishment is usually tested three ways: the rent from tenants who stay, the owner's business or personal income standing behind the debt, and sometimes an interest reserve set aside inside the loan to cover repayments during the vacancy. If the leases that remain are short, the lender will weigh that too; our guide to weighted average lease expiry explains how. If the building will be fully empty for a period, the file starts to look like a vacant property loan, which is covered in vacant commercial property finance.

In deals I've seen, the owners who get through this stage cleanly are the ones who timed the works to lease expiries rather than ending tenancies early, and who showed the lender a leasing plan with an agent's rent evidence before the first draw.

Which approvals and upgrades add to the cost and the timeline?

The approvals that most often add cost are the building permit itself and the upgrades a permit can require, such as fire safety, accessibility and essential services work, because a permit can trigger upgrades you did not plan, and what it triggers varies by building. An older building that has been left alone for decades may be compliant as it stands but not once major works begin, and the extra scope can be a meaningful share of the budget.

  • Planning approval. Needed for some external or structural works, and sometimes for changes to how the building is used. Timing varies widely by council.
  • Building permit. Issued by a building surveyor, who decides what the works must bring up to current standards.
  • Fire safety and essential services. Sprinklers, alarms, exits and the maintenance regime can all be pulled into scope. If the facade carries combustible cladding, see heritage and cladding problems on a commercial building.
  • Access upgrades. Entries, lifts and amenities may need to meet current access standards once works are approved.

Each of these affects the finance as well as the builder. The lender usually wants the permit, or at least the surveyor's scope, before it relies on the quantity surveyor's budget, and a lender typically relies on a valuation for only a few months, and the window varies by lender. If approvals drag, the valuation and the credit approval can both expire before the first draw. Ask your building surveyor what the works will trigger before you lock the loan amount.

How are refurbishment costs treated for tax?

Refurbishment costs generally fall into three tax buckets: repairs, which restore something to its former condition; capital works, which improve or alter the building; and depreciating assets, the plant and equipment inside it. The bucket changes when and how the cost is deducted, and the line between a repair and an improvement is often where owners get caught out.

At the time of writing, the ATO's page on capital works deductions says these deductions cover buildings and extensions, alterations and improvements to them, and that capital works are written off over a longer period than other depreciating assets. It also notes the land itself is not deductible. Replacing a whole roof with a better one, or reconfiguring floors, is likely to sit on the capital works side; patching a leak is likely to be a repair. Your accountant decides which is which on your facts.

For the loan, the tax treatment matters in two ways. It changes the after-tax cost of the works, which can change how much you choose to borrow, and a quantity surveyor's depreciation schedule can sit alongside the cost report the lender already wants.

Sources: Australian Taxation Office, Capital works deductions, last updated 7 February 2023. Read 17 November 2026.

How should you sequence the finance and the works?

The safest sequence settles the scope, costs and approvals before the loan is sized, draws the money in stages against the quantity surveyor's inspections, and refinances only once the new leases are signed. The short version is re-lease, then refinance: a building with fresh leases is worth more and borrows on better terms than one that is finished but empty.

  1. Scope and quotes. Settle what the works include and get a fixed price where you can. Ask the building surveyor what the permit is likely to trigger.
  2. Valuation and quantity surveyor. The lender orders an as is and as if complete valuation, and a quantity surveyor reviews the contract and budget.
  3. Credit approval. The lender sizes the facility on both values, tests servicing on the reduced rent and sets the draw schedule and any interest reserve.
  4. Permits. Approvals issued before the first draw, so the budget the lender approved is the budget the works need.
  5. Staged draws. Each stage inspected, each draw released against the surveyor's report, with the contingency held back for surprises.
  6. Re-leasing. Agent appointed early, incentives priced in, leases signed as floors complete.
  7. Refinance. Once leased, move the debt onto a standard commercial loan on the improved value. Our guide to how to refinance a commercial property loan covers what that lender looks at.

For the wider picture of how lenders read commercial security, see how commercial property loans work. When you are ready to test the numbers on your own building, check eligibility and we will run it against lender policy.

A commercial renovation loan is usually a top-up, an equity release, a staged facility or a short private bridge, sized on the building as it is today and as it will be once the works are done. The lender relies on the quantity surveyor to control the draws, tests servicing on whatever rent survives the works, and expects approvals and their hidden upgrades to be costed up front. Owners who time the works to lease expiries and refinance only after re-leasing tend to get the best result from the finished building.

Key takeaway: get the scope, the surveyor's view and both valuations in hand before you set the loan amount, then re-lease before you refinance.

Frequently Asked Questions

You can get a loan to renovate a commercial property you own, usually by increasing the existing loan, releasing equity or taking a facility that pays out in stages as the works progress. The lender sizes it on the building as it is today and as it will be once the works are finished. Larger jobs also need a fixed price contract and a quantity surveyor report. See how we structure commercial property loans.

A renovation loan usually relies on both an as is and an as if complete valuation rather than one or the other. The as is figure limits what the lender advances before works start, and the as if complete figure sets how far the facility can stretch once the works and new leases are in place. A quantity surveyor confirms the cost to get from one to the other.

A lender counts the rent that actually keeps coming in while a commercial building is being refurbished, not the rent it earned before the works or will earn after. If floors are empty, the gap has to be covered by the owner's other income or an interest reserve inside the loan. Short remaining leases are weighed too; see our guide to weighted average lease expiry.

Whether you can claim a commercial building refurbishment as a repair depends on whether the work restores something to its former condition or improves it. Improvements and alterations generally fall under capital works deductions, which are claimed over a longer period, and plant inside the building is depreciated separately. Your accountant decides the split on your facts; the capex glossary entry explains the term.

A renovation loan can sometimes cover incentives for new tenants, such as a contribution to their fit-out, but lenders treat incentives differently from the building works. Many prefer to see incentives funded from the owner's cash or priced into the as if complete valuation, because they add no value to the building itself. Tenant-side costs are covered in commercial lease fit-out finance; policy varies by lender.

Nick Lim

Nick Lim

Broker, Switchboard Finance

0483 980 567 / [email protected]

FBAA FBAA Accredited
Previous
Previous

Apartment Block Loans: Buying a Whole Block on Commercial Terms

Next
Next

Private Commercial Loans: Lending Against a Shop, Office or Warehouse