Two ways to fund the same build: a bank construction loan written to the bank's policy, or a private funder who writes the facility around the project. This is how the private version works, what it costs, what to check in the term sheet and how you get out of it.
Quick Answer
A private construction loan is a build facility written by a private lender or private credit fund instead of a bank, usually quicker to approve and more flexible on the deal, but priced higher and built around a firm exit. It suits builders and developers whose project sits outside bank policy. Start with how private lending works, or see our private lending options.
Also called: private construction finance, private development finance, private lender construction loan. Private development finance usually means the whole project facility; a private construction loan can be the build stage only.
What is a private construction loan?
A private construction loan is a private construction facility: money from a private lender or private credit fund that pays for a build in stages, secured over the site and the works as they go up. It does the same job as bank construction finance, but the funder writes its own rules for the deal in front of it, where a bank applies a fixed credit policy.
The money behind these facilities usually comes from investors rather than deposits. Private credit funds pool capital from wealthy individuals, family offices, super funds and other investors, then lend it out secured against property. That changes how the funder thinks. A bank wants a loan that fits its policy and its capital rules. A private funder wants a loan that pays its investors a return and gets repaid on time, so it looks harder at the site, the build and the exit, and less at whether you fit a box.
The sector is now big enough to draw regulatory attention. ASIC reviewed the sector in REP 814 Private credit in Australia, released 22 September 2025, looking at how private credit funds are run and how they charge fees and value their loans, and it has kept private credit on its focus list for 2026. For a builder, that means term sheets and fee disclosure are under more scrutiny than they were, but the terms still vary widely from funder to funder.
Our guide on how private lending works in Australia covers the wider product. This insight stays with the build.
How is a private construction loan different from a bank construction loan?
A private construction loan differs from a bank construction loan mainly in who sets the rules, how fast a decision comes, how interest is paid and how much weight the exit carries. The build mechanics look similar: staged payments, progress claims and an inspection before each draw. The table sets the two side by side. For the three-way view that adds non-bank lenders, see the comparison in our construction finance guide.
| Factor | Bank construction loan | Private construction loan |
|---|---|---|
| Who sets the rules | A fixed credit policy applied across every deal | The funder's credit committee, deal by deal |
| What carries the decision | Your income, servicing and the security | The site, the build, your equity and the exit, with income weighed less |
| Time to a decision | Often several weeks, varies by lender | Often faster, indicative and varies by funder |
| Loan size | Set against value and servicing | Set against total project cost (loan to cost), varies by funder |
| Pricing | Lower rates, fewer fees | Higher rates plus establishment and other fees |
| How interest is paid | Usually paid monthly as funds are drawn | Typically capitalised into the facility |
| Term | Rolls into a longer loan after the build | Short, fixed term with a set repayment date |
| Exit | Often the same lender's ongoing loan | Exit at practical completion through sales or a refinance |
The biggest practical difference is the last row. A bank construction loan usually turns into an ordinary loan when the build is done. A private one has to be paid out, so the funder reads the whole file through the question of how it gets its money back.
How big is private credit in Australia?
Private credit in Australia is large in dollars but still small next to the banks, which is one reason its terms vary so much between funders. The regulators' own figures:
| Measure | Figure | Source |
|---|---|---|
| Domestic private credit | Around $200 billion, about 3 per cent of the size of the Australian banking system | APRA, May 2026 |
| Private credit share of financial system assets | Less than 2 per cent, on available estimates | RBA, March 2026 |
| Non-bank lenders' share of financial system assets | 6 per cent | RBA, March 2026 |
Sources: APRA, System Risk Outlook, published 21 May 2026. RBA, Financial Stability Review, March 2026, as at March 2026. Both read 27 November 2026.
When does a private construction loan make sense for a builder or developer?
A private construction loan makes sense when the project is sound but sits outside what a bank will write, and the extra cost is smaller than the cost of waiting or missing the deal. Common cases are a project a bank has turned down on policy, a borrower whose income evidence is thin or out of date, a timeline a bank cannot meet, or a gap between what the senior lender will lend and what the build needs.
That last case is where a stretch facility can help. Our insight on stretch senior construction finance covers one loan reaching higher than a bank would, and the mezzanine finance guide covers a second, smaller loan sitting behind the first. If the site file itself is what a funder needs to see first, the DA-approved site file post sets out what a private lender reads before it gets to the build.
Often suits a private facility
- Sound project, but outside bank policy
- Strong equity, thin or late income evidence
- Timeline a bank cannot meet
- Clear sales or refinance exit at completion
- Builder with a solid fixed price contract
Usually better kept with a bank
- Project already fits bank policy
- Long build with no fixed end date
- Thin margin that cannot carry higher costs
- No clear way to repay at completion
- Little or no equity left in the deal
The private route works best as a bridge to a known outcome, not as a long-term home for a project. If a bank will write the build on reasonable terms, the bank is usually cheaper.
How do drawdowns, quantity surveyor reports and cost to complete tests work?
Drawdowns on a private construction loan are paid in stages against the builder's progress claims, after an independent quantity surveyor confirms the work is done and the money left in the facility still covers the rest of the build. That last check is the cost to complete test, and from the underwriter's seat it is the control that matters most.
A cost to complete test is the funder's check that the undrawn loan, plus any equity still to come in, covers every dollar needed to finish the build. If the quantity surveyor finds that costs have risen and the facility no longer covers them, the funder can hold the next draw until the gap is filled, usually by you putting in more equity. Our guide on what happens when a construction funder withdraws mid-build shows why funders guard this test so closely.
A typical draw cycle runs like this:
- Initial report. Before the first draw, the quantity surveyor reviews the contract, budget and program and sets the baseline the facility is measured against.
- Builder claims. The builder lodges a progress claim for work done in the stage.
- Site inspection. The quantity surveyor inspects and confirms the value of work completed.
- Cost to complete check. The report confirms the undrawn facility still covers the remaining build.
- Draw released. The funder pays the builder, and the interest on that draw starts running.
The quantity surveyor works for the funder, not for you, and their report fee is usually charged to the facility. Our insight on the quantity surveyor report in development finance covers what goes into one, and the progress claims and drawdowns guide covers the claim side.
What does a private construction loan cost, and how is interest charged?
A private construction loan costs more than a bank construction loan, through a higher interest rate and a set of fees, and the interest is usually added to the loan rather than paid monthly. The headline rate is only part of the cost, so compare the total cost over the expected term, not the rate alone.
When interest is capitalised into the facility, as it typically is, each month's interest is added to the balance and paid out at the end with everything else. That helps cash flow during the build, because nothing comes out of your pocket each month, but it means interest is charged on interest and part of the facility limit is set aside to cover it. Our glossary entry on capitalised interest and the insight on capitalised interest in a development loan show how that reserve is sized.
The cost lines to expect in a private construction facility:
- Interest. Charged on drawn funds, usually higher than bank pricing and varies by funder and risk.
- Establishment fee. Charged when the facility is set up, often a percentage of the limit.
- Line or commitment fee. Some funders charge on the undrawn part of the facility as well as the drawn part.
- Quantity surveyor, valuation and legal costs. The funder's reports and lawyers, usually paid by you.
- Extension and exit fees. Charged if the term runs over or when the loan is repaid, depending on the term sheet.
- Default interest. A higher rate that applies if you breach the agreement or miss the repayment date.
Whether the higher cost is worth it depends on what the project earns and what the alternative costs. Losing a site or sitting idle for months can cost more than a private facility.
What should you check in a private construction loan term sheet?
In a private construction loan term sheet, check the facility limit, every fee, how interest is charged, the draw conditions, the term and extension, and the default clauses. Those lines set the real cost and the real risk. The term sheet is where the funder protects itself, so read it as the worst case, not the best.
- Limit and loan to cost. How much is lent against total project cost (the loan to cost ratio, which varies by funder), and how much of the limit is set aside for interest.
- Fees. Every fee named, when it is charged and whether it is on the limit or on drawn funds.
- Interest. The rate, whether it is capitalised and how often it compounds.
- Draw conditions. What the quantity surveyor must sign off and what happens if the cost to complete test fails.
- Equity. How much you put in, and whether it must go in before the first draw.
- Term and extension. The repayment date, whether an extension is available and what it costs.
- Default. What counts as a default, the default rate and how quickly it applies.
- Security and guarantees. Which properties are mortgaged and who signs personal guarantees.
A term sheet is usually a summary before the full facility agreement. Have your solicitor read the agreement itself before you sign, because the detail there is what binds you.
How do you exit a private construction loan when the build is finished?
You exit a private construction loan at the end of the build by repaying it from sales settlements, by refinancing to a cheaper lender, or by a mix of both. The funder will want to see that exit strategy before it approves the facility, not when the build is nearly done.
The planned exit at practical completion usually takes one of three paths. Sales settle and repay the loan. Unsold stock is refinanced into a residual stock loan while it sells, covered in our residual stock loans guide. Or a property you plan to keep is refinanced into a longer-term bank or non-bank loan once it is finished and valued. The trigger in each case is practical completion, the point the build is signed off as done.
The exits that go smoothly are the ones lined up early: the refinance lender spoken to before the build starts, or presales and settlement dates that land inside the term with room to spare. A build that runs late eats into the term, and an extension costs money.
A private construction loan funds the build in stages like a bank loan, but the funder writes the terms around the project, weighs the site, the build and the exit over your income, and usually adds the interest to the loan. It costs more, and the cost to complete test and the default clauses carry most of the risk. It works best when the project is sound, the equity is real and the exit is planned before the first draw.
Key takeaway: compare total cost over the term, read the default clauses first, and have your exit lined up before you sign.Frequently Asked Questions
Private construction loans are usually more expensive than bank construction loans, through a higher interest rate plus establishment, line and exit fees. Because interest is often capitalised, the total cost grows the longer the build runs. Compare the full cost over the expected term against what waiting for a bank would cost the project.
You can get development finance from a private lender in Australia, either for the whole project from site to completion or for the build stage only. Private funders weigh the site, the feasibility, your equity and the exit more than your income. Our development finance page covers the full-project version.
Private lenders do fund commercial construction, including industrial, retail and mixed-use builds, as well as residential projects. Appetite varies by funder and by asset type, and the exit matters even more on commercial builds because buyers and refinance lenders are fewer. The construction finance guide sets out how each lender type approaches a build.
You do not need a broker for a private development loan, but many private funders only take deals through brokers, and terms vary widely between them. A broker can put the same file in front of several funders and compare the full cost and the term sheet clauses side by side. Our guide to private mortgage lenders in Australia explains how that market works.
If a private construction loan runs past its term, the funder may offer an extension for a fee, or treat the missed repayment date as a default and charge default interest. Either way the cost rises quickly, so raise a likely delay with the funder early. Refinancing unsold stock into a residual stock loan is a common way out.